Items where Subject is "Konstruksi Alat"

Group by: Creators | Item Type
Jump to: A | F | K | P | S | T
Number of items at this level: 6.

A

Ahmad, Nur Maulid and Eridja, Dwi Setio Putra and Al Fazri, Muhammad Fariz and Alzafirah, Della and Pratiwi, Izwa Syahbina (2026) RANCANG BANGUN KERNEL SILO DAN KERNEL BULK PADA PABRIK KAPASITAS 300 KG/JAM. Diploma (D3) thesis, Politeknik Kelapa Sawit Citra Widya Edukasi.

F

Fitriani, Diana and Mawardah, Riska and Ramadhani, Faris Zaki and Ritonga, Ulia Junanda and Mahendra, Aprizal Eka (2026) Rancang Bangun Vibrating Screen Single Deck Mini Palm Oil Mill Kapasitas 300 kg/jam. Diploma (D3) thesis, Politeknik Kelapa Sawit CWE.

K

Kartina, Melin and Aisyah, Zahra Nur and Kuswandi, Dimas and Saeful, Anam and Basri, M. Ikbal Putra (2026) Rancang Bangun Continuous Settling Tank (CST) Berdasarkan Prinsip Pengendapan Pada Pemisahan Minyak Untuk Mini mill palm oil Kapasitas 300 kg/jam. Diploma (D3) thesis, Politeknik Kelapa Sawit CWE.

P

Pratama, Habib Raga and Alayyubi, Muhammad Salahuddin and Ardinata, Mukhri and Melisa, Icha and Agatha, Katarina (2026) Rancang Bangun Tugas Akhir Vacuum Dryer pada Mini Palm Oil Mill Kapasitas 300 kg/jam. Diploma (D3) thesis, Politeknik Kelapa Sawit Citra Widya Edukasi.

S

Samosir, Yolanda Novi Afriani and Indrawan, Kelvin Syahdan and Pangestu, Andhika Yusuf and Pohan, Rendi Febriansa and Sinurat, Rafael Arfandi (2026) RANCANG BANGUN VERTICAL STERILIZER MINI MILL KAPASITAS 300 KG/JAM TBS. Diploma (D3) thesis, Politeknik Kelapa Sawit Citra Widya Edukasi.

T

Tri Julianto, Rendi and Ritonga, Tasya and Rahmadani Nasution, Rizki and Abdan Firzy, Al and Haryadi, Haryadi (2026) RANCANG BANGUN CAKE BREAKER CONVEYOR MINI PALM OIL MILL KAPASITAS 300 KG / JAM. Diploma (D3) thesis, Politeknik Kelapa Sawit CWE.

This list was generated on Mon Nov 23 04:30:25 2026 WIB.